FREE SHIPPING ON ORDERS OVER $199

Cart

K&N FIPK Air Intake System 57-1525 | 94-02 5.9L Cummins
K&N FIPK Air Intake System 57-1525 | 94-02 5.9L Cummins
1 × $367.99
XDP Duramax CAT Filter Adapter Wrench 2001-2016 GM 6.6L Duramax XD325
XDP Duramax CAT Filter Adapter Wrench 2001-2016 GM 6.6L Duramax XD325
1 × $18.95
XDP CAT Adapter with 1R-0750 Filter Bleeder Screw & Spacer 01-16 GM 6.6L Duramax
XDP CAT Adapter with 1R-0750 Filter Bleeder Screw & Spacer 01-16 GM 6.6L Duramax
1 × $109.95
Purepower 7807-PP Fuel Injector Line (CLY. 1 & 8) | 11-16 GM 6.6L Duramax
Purepower 7807-PP Fuel Injector Line (CLY. 1 & 8) | 11-16 GM 6.6L Duramax
1 × $41.36
Industrial Injection GM Performance Cast Pistons .040 Over | 01-16 6.6L Duramax
Industrial Injection GM Performance Cast Pistons .040 Over | 01-16 6.6L Duramax
1 × $1,884.97
XDP Wrinkle Black HD High Output Alternator 2001-2007 GM 6.6L Duramax XD355
XDP Wrinkle Black HD High Output Alternator 2001-2007 GM 6.6L Duramax XD355
1 × $429.95
Subtotal: $2,853.17
SKU: XD475 Categories: , Tag: Brand:

XDP Remanufactured 7.3L AE Fuel Injector XD475 For 1999.5-2003 Ford 7.3L Powerstroke (8 Long Lead)

$164.95

In Stock

Product total
Options total
Grand total
Quantity

Social Share:

Description

The Remanufactured 7.3L AE Fuel Injector XD475 will replace the damaged #8 Long Lead injector in your 1999.5-2003 Ford 7.3L Powerstroke. With years of manufacturing experience and over 30 million diesel fuel injectors produced to date, you can be sure you are getting a quality product.

By surpassing the manufacturers’ current design specifications, these injectors have less than 0.2 percent warranty rate. Every injector is comprehensively tested for nozzle flow and needle lift as well as opening operation and leakage.

Additional tests include shot-to-shot flow meters, poppet seat leakage test, and injection timing measurements for best-in-class testing. Quality and Testing Advanced end-of-line testing, delivery, leakage and opening characteristics.

Precision remanufacturing process ensures highest quality, reliability and performance. Opening clearances are set to strict specifications; validated with engine and vehicle testing and compared to OE product.

Features:

  • Stock HP and Flow Rating
  • Best In Class End-Of-Line Testing Nozzles
  • Tested For Flow, Leakage and Needle Lift
  • In-Line Error Proofing Incorporated In Assembly Process

Additional information

Weight 3 lbs
Dimensions 11 × 5 × 4 in
Brand

XDP

MPN

XD475

Google Product Category

888

Reviews

There are no reviews yet.

Be the first to review “XDP Remanufactured 7.3L AE Fuel Injector XD475 For 1999.5-2003 Ford 7.3L Powerstroke (8 Long Lead)”

Your email address will not be published. Required fields are marked *

Related Products

add_action( 'woocommerce_single_product_summary', 'wc_ninja_add_brand_to_product_page', 19 ); function wc_ninja_add_brand_to_product_page() { echo do_shortcode('[product_brand width="64px" height="64px" class="alignright"]'); }